About The Group

I am a member of group 2 and my candidate number is 8720. The other members of my group are Phoebe Hung (8017) and Gabriel Meytanis (8560). To see my portfolio evidence please click on the three labels on the right named: A2 Research and Planning, A2 Construction and A2 Evaluation.

This is my music video

This is my music video:

My Music Video

Digi out

This is the outside panel of my digi-pak album cover:

digi out pic

digi out pic

digi in

This is the inside panel of my digi-pak album:

digi in pic

digi in pic
This is a link to my artist website, please click on the image below to go to GiGi Official website:


Friday, 2 September 2016

Construction Post 3: Week 3 production

In production week three our aims were to continue working on our music video, continue work on the website (such as adding the finer details) and to take the extra promo shots and began photo-shopping them.

Music Video

This week we focused on completing as much of the video as possible. We made a lot of headway and it is great to see our video taking shape! We have added the effect of cross dissolves on the last repeated lines of the song "Sit still, look pretty" and we like how the different coloured backgrounds blend into each other.

This is an image of what our timeline looked like at the end of construction week three:

End of production week 3 music video timeline
At the end of the week our teachers suggested that we used more inter-cutting between the different set-ups so we didn't have 'blocks' of shots in each in different narrative set-up. More teacher feedback can be seen below:
Teacher feedback
We incorporated the idea of blending the different coloured backgrounds together through the use of the cross dissolve tool:
The cross dissolve ending in premier pro
Below are examples of what the cross dissolve looks like before grading:


Snapshots of the cross dissolve

Website

We did lots of really good work on the website this week and it is beginning to take shape. We began photo-shopping the GiGi logo onto merchandise such as the i-Pad cover that can be seen on the right. I also enjoyed creating product descriptions and adding returns and shipping information to make our products look real.

We worked on creating continuity between the different pages to create a consistent 'look' and branding for the website. We also created pages such as the different tour locations to add more sources of revenue and the terms and conditions to make the website look genuine and conventional.

Promo Shots

We re-took the front panel promo shots on Wednesday and incorporated the target audience feedback of not having glitter on my face.
Our idea for the front panel but without glitter on my face

Below is the shot we are are using on the front cover of our album:

Our front panel shot
Overall production week three has been very successful and we are in a very good place in all three tasks.

Construction Post 2: Week 2 production

In week two of production our main aims were to take our promo shots which we shot on Thursday and begin to edit our music video as well as begin work on our website.

Music Video Editing:

In editing this week our priorities were:
  • Renaming shots
  • Catergorising shots
  • Colour coding shots
  • Finding the best takes
  • Beginning to put the music video together
Catergorised shots
Below is a picture of how we colour coded the shots. This was a great benefit to us as it allowed us to clearly see on the timeline our different set-ups. It showed us clearly the structure of our music video and then in the latter part of the song our rapid inter-cutting between the different set-ups.

Part of our colour-coded timeline
This picture below shows how to colour code the shots and the one below shows what the colour coded shots look like in the different folders;

How to colour code shots
Colour coded shots in the folders
Website:

At the start of the week I created a brief plan of the website using Wix so we could begin to understand the practicalities of using Wix:

Early plan 

One of the first things I did on the website was to create the footer. The footer is very important as it contains lots of website conventions that are important to do correctly. I ensured that our footer included:
  • The record label name, logo and contact details
  • Social media links
  • Terms and Conditions
  • Privacy policy
A conventional footer which I used

Our footer
I used the footer on the left as a reference point when I was creating our website's to ensure we incorporated all the conventions. From asking my target audience's opinion one commented that they would want the page titles included there as well for easy maneuvering around the website.



I also worked on the bio page by creating and 'answering' the questions (as GiGi). A vital reference point for this was Little Mix's bio page on their website, examples of which can be seen on the left. I liked the type of questions used as it allows a fan to learn the basics about the artist.

From talking to another member of our target audience I am going to incorporate their feedback of adding some sort of animation to the questions to make it more visually interesting and to ensure there are not too many blocks of writing on the website.



Promo Shots


GiGi Hadid
Our Stimulus Sheet
When taking our promo shots we used existing poses for inspiration such as the one to the left through the idea of raised eyebrows and a slightly opened mouth. We also used our stimulus sheet that we created in pre-production:


Examples of some of our different set-ups from our promo shots can be seen below:



Promo shots

We were pleased with most of the shots and even the ones that we are not going to use for the album can be used for our website and social media platforms.

We decided that we wanted to re-shoot the front panel image of GiGi as we didn't feel like having glitter on my face worked. Similarly a member of our target audience said that they felt that just having glitter in my hair would look better. Our teachers also suggested that we experimented more with the lighting in the promo shots to give us more shots to chose from.
The shot type we are going to re-take
Overall, production week two has been very successful as we achieved lots following a tiring week of filming.

Construction Post 1: Week 1 production

Week 1 of production was our Main Shoot week, the schedule of which can be seen below (it is colour coded in regards to which set-up we were shooting):

Our Main shoot schedule
This is a quick video tour of the Seward Studio I filmed just before filming began on Monday:


Monday

We had two set-ups to complete on Monday- Puppet and Snow White.

Puppet Set-Up

We scheduled Puppet first as we believed that this would take us less time. We had set up the rope/rigging at the end of our test shoot week so we were ready to start filming straight away.

We improved the make-up from what we had learnt in the test shoot. I improved the characterisation of the puppet through the idea of being 'possessed' and adapted my posture by standing knock-kneed to show this.

The improved make-up
Another thing we included from our observations of the test shoot was to have more experimental shots, so we used the dolly for the first time:
The Dolly
Below is a video of our feedback of our evaluation of the Puppet set-up:



Snow White Set-Up

After having a good morning doing Puppet we were in high spirits for Snow White. This set-up had gone particularly well in our test shoot so we had the added pressure of getting shots as good as the week before.

I was very pleased with the uses of intertextual (Goodwin) signifiers in the costume and props which enabled us not to have to buy a Snow White costume: our signifiers were blue & yellow ribbons, the dwarfs and the apple. We improved the shot of me sitting on the floor with the dwarfs from the test shoot by lowering the tripod to its lowest level to create a better low angle shot.

The low-angle shot and signifiers
I really enjoyed performing in the Snow White set-up, especially doing gestures such as twiddling my hair and interacting with the dwarfs.
What I looked like on the monitor twiddling my hair
Below is our feedback video on how we felt that Snow White went:


Tuesday


1950's Housewife Set-Up

We had a very productive day on Tuesday and managed to end the morning session about four hours ahead of schedule and we were able to start the Land Girls set-up in the afternoon.

1950's was another fun set-up as I was able to play a comedy role and create a parody of the stereotypical 1950's housewife. I also liked the inter-textual reference in the poster we made of "You Mean A Woman Can Open It?"

1950's Housewife

From target audience feedback from our test shoot footage we decided to incorporate more experimental movement such as tracking the dolly forwards and backwards on "Sure I'm a pretty girl..." in the middle eight to hopefully make that part of the music video more visually interesting.

Below is our feedback video:



Land Girls Set-Up

As we were four hours ahead of schedule we decided to begin Land Girls as we believed that we could get the majority of it done that afternoon. By the end of the day we had filmed most of the shots and only had experimentals and long shots to do on Wednesday morning. 

I was really pleased with the lighting set up which we had created in the test shoot and were able to re-create it through the use of 'memories' on the lighting desk (a description of which can be seen in the lighting demo video at the end of this post). We improved the hair and make-up from the test shoot as we thought it looked too natural for a music video.

The new hair and make-up
I enjoyed performing in Land Girls as I got to interact with all the different props and incorporated gestures such as salutes into my choreography.

The salute pose
Below is our feedback video on our thoughts about Land Girls:



Wednesday

On Wednesday we finished off Land Girls and then began Doll's House- our biggest set-up:

Doll's House Set-Up

During the day we were in the studio at different times and because Phoebe and Gabriel acted in this set-up it meant some of their shots could be filmed when I, for example, was in lessons.

Gabriel and Phoebe acting
Also, because I was not the only actor it gave me a chance to do some of the filming which I really enjoyed:
Me filming some of the Doll's House shots
I also used my acting skills to direct Phoebe and Gabriel to make them appear more physically doll-like.

For all the set-ups we used our shoot-board and created a shot list alongside it to make sure that we did not miss out any shots. The Doll's House shot list can be seen below:

Doll House Shot List
Thursday

During Thursday we got the rest of Doll's House filmed and left our slow-mo trashing of the Doll's House until the end, as we had to keep putting the set back to how it was so we could do more takes. We also developed how Phoebe and I got out of the Doll's House to complete the narrative thread of our video.

Trashing the Doll's House
We ended the day by setting up the studio for the performance set-up on Friday.

Our feedback video is below:




Friday
Performance Set-Up

We only scheduled one set-up for Friday as we wanted to get as much of the filming done earlier in the week so it would take the pressure off on Friday. The performance set-up was very important as we needed to clearly illustrate the character of our artist GiGi in order for the artist identity not to become lost in all the different set-ups and characters that she played.

GiGi in performance
In Performance we tried to establish Goodwin's Star Identity and portray GiGi's personality through her mannerisms and how she performed the song.

Our feedback can be seen below:


Saturday

After watching our footage back on Thursday afternoon we decided that we need to re-shoot:
  • Our teachers thought that in the Snow White mid shots as I looked too red 
  • Snow White zoom out from the dwarfs to make sure we had a take good enough for our music video
  • 1950's interaction with our new props of pancakes and ketchup
Having the possibility to do pick-ups was very beneficial as it meant that we finished the week with the knowledge that we had all the footage that we wanted.

Below is a time lapse of part of the Saturday session:



Below is a video of a lighting demonstration that Gabriel and I did on Saturday after we finished filming:


Overall, I am very pleased with what we were able to achieve in our main shoot and am looking forward to editing our hours of footage!

R&P Post 33: Reflections on my role and contribution during Research and Planning

I believe that we all played to our strengths in research and planning which resulted in us being very well prepared for construction. I feel that I contributed a lot to research and planning both through jobs we completed individually and as a group.

Jobs I individually completed:

  • Sourcing and buying props. 
I made the prop list and sourced props from the drama props room, the media prop cupboard, props I owned and ordered the wallpaper and pillow stuffing online and I also did the set design for our different set-ups.

A screenshot from my research of wallpaper for Doll's House
  • Created the Cast List & Shoot Board
Cast List & Shootboard
This saved us a lot of time in the test shoot and kept us focused on what we needed to achieve and the cast list helped us with our characterisation.
  • Sourced my costume and make-up
My 1950's costume, hair and make-up
  • Choreographed and rehearsed my performance and performed the role of our artist, GiGi
Part of my choreography in Snow White

  • Emailed ArtBeatz in regards to copyright 
The email


Jobs I completed as part of our group

  • Setting up the lighting and positioning individual lights
Me re-positioning one of the ceiling lights
  • Filming
Me filming some of the Doll's House shots


Despite acting in most of the music video I enjoyed being able to film the scenes of Phoebe and Gabriel in the Doll's House set up. My knowledge and ability using the camera have greatly improved in the test shoot especially in my framing and focusing of shots.

  • Wallpapering the boards for the Doll's House set-up
The Wallpaper under the studio lights

  • Making the seven dwarfs and other posters
The Dwarfs


R&P Post 32: Test shoot and rough edit

The test shoot has been an essential part of our pre-production/construction cross over stage in the production of our music video as it has allowed us to see our ideas come to life. Below is a picture of the schedule for the week (I am a member of group 2 - coloured green).

Our Test Shoot schedule
We were able to create our lighting set ups, finalise our set design ideas and see how the costume, hair and make-up looked in the studio (pictures of which can be seen below).

Our Doll's House Set-Up


Me in my land-girls costume, hair and make-up
We also used our studio time to film all the shots we had decided on in our shoot board as well as some experimental ones. When doing our rough cut we decided that we needed more shots with camera movement to create a more visually interesting and engaging music video so therefore next week in our main shoot we will experiment and use the dolly.

We had to make sure that all of our pre-production was done by the beginning of this week to allow us to film all the shots with all the props we needed. For example, we finished wallpapering and making the dwarfs in the lessons on Tuesday and Wednesday.

Below is our rough cut:



Because we had no time between our test shoot week and our main shoot week, we only did a rough cut for the first part of our song.

Things we learnt from our Test Shoot and Rough Cut:

  1. Allocate longer periods of time rather than 5/10 minutes per shot as this decreases the time pressure and allows us to have more flexibility whilst still getting everything done in our allocate time per set-up
  2. Make sure our set ups are all different- we achieved this through set design, costume, characterisation of GiGi in my performance and lighting colours.
  3. Make sure GiGi was sufficiently lit- for example in some Snow White and 1950's Housewife scenes I looked red and yellow respectively from the background colours.
  4. A key thing we learnt was that we need multiple takes of each shot type and the split between lip-sync and 'poses' in order to give us enough editing possibilities and cutaways.
  5. We want to create a visually interesting music video through incorporating conventions such as beauty shots and cutting to the beat.
  6. We learnt how long lighting takes to set up but now that we have saved our lighting set ups as 'memories' in the studio on the lighting desk, in main shoot we will just have to adjust the position of the lights accordingly rather than having to choose which coloured gels we would have for which light. 
  7. In regards to costume and make-up, we were happy with all the costumes but wanted to have more stand-out make-up for puppet and a brighter purple lipstick for performance.
In the Puppet Set-Up we had a problem with the make-up and string which we were able to fix quickly:
Puppet Set-Up during the Test Shoot
In this set-up we decided that we needed to improve the make-up so in the main shoot we will use a face-painting sponge to make the white cover my face better and used lipstick to make the circles on my cheek stand out more. We found that the string was not that visible on camera so in the main shoot we made it thicker by looping it over the rigging more times.

Overall, I am quite pleased with the test shoot and rough cut as it allowed us to see what we were doing well and what we should change in the main shoot to allow us to create the best music video we can. Below is a picture of the list of teacher feedback we received:

Teacher Feedback

We also received some target audience feedback which helped us identify what we could improve in the main shoot:

Target Audience Feedback
I also thought that it would be important to get feedback from a member of our tertiary audience to see what a member of a different age group thought of our video:

Tertiary audience feedback
Overall, all the different types of feedback were useful in order to make changes for our main shoot and in our edit.